Finished full-flake polyaspartic garage floor by Garage Transformers in Austin, Texas

Garage floor coating · Based in Cedar Park, serving greater Austin

Garage floors that actually last 15+ years.

We diamond-grind the slab, coat it with 100% solids epoxy and full flake, and seal it with polyaspartic. Most garages done in one day. 15-year to lifetime warranty.

300 Google reviews · 4.9★ · Licensed & insured in Texas

NEXT AVAILABLE INSTALL: THU, JUL 30 · 50/50 FINANCING, NO INTEREST
1,200+
FLOORS INSTALLED
300
GOOGLE REVIEWS · 4.9★
1-DAY
INSTALLATION
15YR–LIFE
WARRANTY
PROOF / BEFORE & AFTER

Before & after

Same slab. Diamond-ground, coated, and sealed in a single day.

After: full-flake polyaspartic garage floor installed by Garage Transformers
Before: bare untreated concrete garage floor with stains and cracks before coating
BEFORE
AFTER
ROUND ROCK, TX / FULL FLAKE POLYASPARTIC / INSTALLED IN 1 DAY
WHAT HOMEOWNERS SAY

Real reviews from Austin homeowners

"Garage Transformers showed up with a diamond grinder and walked me through every layer. Two years later, zero peeling and zero hot-tire pickup."
Marcus W.
Pflugerville, TX
Google Review
"Our patio from a big-box installer yellowed in six months. Garage Transformers' polyaspartic looks identical 14 months later."
Lauren P.
Round Rock, TX
Google Review
"After 21 years of an embarrassing garage, I can finally park my truck inside. The crew was meticulous, on time, and clean."
Steven D.
Leander, TX
Google Review
WHY FLOORS FAIL

Why cheap epoxy floors fail

Every failed garage floor we tear out has the same three problems.

FAIL.01

No slab prep

Rolled over dirty concrete with no grinding. The coating never bonds. It lifts within a season.

FAIL.02

Water-based epoxy

Thin box-store kits that dry too fast to level. Hot tires pull them right off the slab.

FAIL.03

No UV top coat

Straight epoxy under Austin sun yellows and chalks in months. Polyaspartic prevents both.

HOW WE DO IT

How a floor gets done in a day

01
STEP

Diamond grind the slab

Industrial grinders open the concrete pores so the coating chemically bonds. No acid etch, no shortcuts.

02
STEP

Repair cracks and joints

We fill cracks, chips, and expansion joints with structural filler before any coating goes down.

03
STEP

100% solids epoxy base

A thick, moisture-tolerant base coat rolled on wet. This is the layer that holds everything together.

04
STEP

Full flake broadcast

Vinyl flakes broadcast to refusal while the epoxy is wet. Fully covered floor, no color bleed-through.

05
STEP

Polyaspartic top coat

UV-stable, chemical-resistant seal. Cures in hours, lasts 15 years, and won't yellow in Texas sun.

FLAKE BLENDS

Pick your color

Ten flake blends. Every system is built on the same base and top coat. Tap a blend and your choice carries into the estimator.

HOW YOU PAY

Half when it's done. Half a month later.

No deposit to book. You pay half the day we finish and half thirty days later. No interest, no third-party lender, no credit check. Just a written agreement between us.

THE CREW

We're an in-house crew based in Cedar Park. No subcontractors. The people who quote your floor are the people who grind it, coat it, and stand behind it for 15 years. In business since 2018.

COMMON QUESTIONS

Common questions

FREE QUOTE / 24-HOUR RESPONSE

Get it done right the first time.

One free consultation, one in-house crew, one floor that outlasts the mortgage.